Activity2: Item rates for installation & commissioning of transformer


Installation & Commissioning of 315 KVA dry type transformer

Schedule of quantity

Note: This schedule of quantity is for providing an idea regarding item specifications during the execution of the above work. Rates are subjected to vary from time to time. 


Sl.
No.
Description of item
Unit
Quantity
Rate
 (Rs)
Amount
(Rs.)
1
Removal of transformer yard fencing by carefully removing the nut bolts etc., Decommissioning of the existing 630 KVA, 11/0.4 kV oil transformer and shifting of transformer from the platform to the safe area within substation according the instructions of engineer in charge.
job
1
7,500/-
7,500/-
2
Shifting of the 315 KVA, 11KV/433 V Cast Resin Dry type transformer from substation area to platform including locking of transformer wheels and re-fixing the fencing to original condition etc as directed by the engineer incharge.
job
1
5,000/-
5,000/-
3
Installation & commissioning of new 315 KVA Cast Resin Dry type transformer in accordance with IS 10028 - Code of practice for Installation & maintenance of transformer including Pre commissioning tests and earthing of neutral and body of transformer etc. complete as directed by the engineer incharge..
job
1
20,000/-
20,000/-
4
Arrangement of temporary power supply during changing of transformer. (630 KVA transformer with a load demand of 240 KVA)
Day
3
3,000/-
9,000/-

Total
41,500/-